JAKARTA. Governor Basuki “Ahok” Tjahaja Purnama has blamed a dredging project initiated by the Public Works Ministry as the trigger for a flood that brought parts of North Jakarta to a standstill on Friday. “There was a 215-meter long embankment that was destroyed by a contractor to make way for heavy equipment. They have rebuilt the embankment, but there was a 35-meter-long section that was still open,” Ahok said on Monday at City Hall. He was referring to private contractors carrying out a dredging project on the Sunter River in North Jakarta, led by the Ciliwung-Cisadane Flood Control Office (BBWSCC) that operates under the aegis of the Public Works Ministry. Ahok said he had filed a complaint with the body regarding the situation. “I told them, it does not make sense to destroy an embankment for a project, particularly in the rainy season. It’s ridiculous,” he added.
Ahok blames ministry project for Friday flood
JAKARTA. Governor Basuki “Ahok” Tjahaja Purnama has blamed a dredging project initiated by the Public Works Ministry as the trigger for a flood that brought parts of North Jakarta to a standstill on Friday. “There was a 215-meter long embankment that was destroyed by a contractor to make way for heavy equipment. They have rebuilt the embankment, but there was a 35-meter-long section that was still open,” Ahok said on Monday at City Hall. He was referring to private contractors carrying out a dredging project on the Sunter River in North Jakarta, led by the Ciliwung-Cisadane Flood Control Office (BBWSCC) that operates under the aegis of the Public Works Ministry. Ahok said he had filed a complaint with the body regarding the situation. “I told them, it does not make sense to destroy an embankment for a project, particularly in the rainy season. It’s ridiculous,” he added.