KONTAN.CO.ID -TANGERANG. The Government finally paved the way for the development of Nuclear Power Plant (PLTN). Research and Development Agency (Balitbang) of Ministry of Energy and Mineral Resources (ESDM) has completed the Study of ThorCon’s Thorium Power Plant. The result of study, the thorium power plant met the initial requirements in accordance with the Act No. 10/1997 concerning Nuclear Power (on Nuclear Energy), as well as Act No. 17/2007 concerning the National Long Term Development Plan of 2005-2025, which mandates the use of nuclear power plants in 2025. Baca Juga: U.S., Chinese trade deputies face off in Washington amid deep differences
Ministry of Energy and Mineral Resources recommends Nuclear Power Plant Project
KONTAN.CO.ID -TANGERANG. The Government finally paved the way for the development of Nuclear Power Plant (PLTN). Research and Development Agency (Balitbang) of Ministry of Energy and Mineral Resources (ESDM) has completed the Study of ThorCon’s Thorium Power Plant. The result of study, the thorium power plant met the initial requirements in accordance with the Act No. 10/1997 concerning Nuclear Power (on Nuclear Energy), as well as Act No. 17/2007 concerning the National Long Term Development Plan of 2005-2025, which mandates the use of nuclear power plants in 2025. Baca Juga: U.S., Chinese trade deputies face off in Washington amid deep differences